Back

Screw Conveyor PM

This procedure outlines the preventive maintenance (PM) steps for a screw conveyor. It emphasizes safety, proper equipment inspection, and addressing any identified issues to ensure reliable and efficient operation.
Impact Fertilisers - Manufacturing
12/30/2024

Screw Conveyor PM

This procedure outlines the preventive maintenance (PM) steps for a screw conveyor. It emphasizes safety, proper equipment inspection, and addressing any identified issues to ensure reliable and efficient operation.

    Take 5

    Pre-Start

    Before beginning this task - STOP, step back and look.

    Do I understand what I need to do?

    • Yes
    • No
    • N / A

    Do I have the correct PPE for the task?

    • Yes
    • No
    • N / A

    Do I have the suitable tools and equipment for the task

    • Yes
    • No
    • N / A

    Am I trained, competent, licensed and fit to perform the task?

    • Yes
    • No
    • N / A

    Are there any hazards above, below, behind or inside?

    • Yes
    • No
    • N / A

    Does this task require a high risk permit - Hot works, working at heights, confined space,, rigging.

    • Yes
    • No
    • N / A

    Are all energy sources isolated and locked out?

    • Yes
    • No
    • N / A

    Hazard Identification

    Does the task involve any of the following hazards? If you answer YES to any of the following, then document the controls required.

    Chemical - Handling, inhaling, contact of substances?

    • Yes
    • No
    • N / A

    Dust and fume - Welding fume, dust / fibre, silica etc?

    • Yes
    • No
    • N / A

    Electrical - Live work, leads, wet areas?

    • Yes
    • No
    • N / A

    Environmental - Spills, odours, airborne emissions?

    • Yes
    • No
    • N / A

    Gravity - Slips, trips and falls or struck by a falling object?

    • Yes
    • No
    • N / A

    Noise?

    • Yes
    • No
    • N / A

    Pressure - Contact with pressurised fluid, air or gas?

    • Yes
    • No
    • N / A

    Traffic management?

    • Yes
    • No
    • N / A

    Is it safe to proceed?

    Are all hazards identified and controlled?

    • Yes
    • No
    • N / A

    Is it safe to proceed?

    • DiamondLogo.png
    • Yes
    • No
    • N / A

    Screw inspection.

    If you are unable to complete all then leave blank. You can exit at any time and the changes you have made, including notes etc will be saved. The work order will remain open until the checklist is complete. If any faults are found and a Fail is recorded a new work order based upon the notes you provide will be generated when this work order is completed. Please ensure that you enter as much detail in the notes as possible, including pictures.

    Replace all covers and guards. Run in manual and ensure there is no abnormal noise or vibration.

    • Pass
    • Flag
    • Fail

    Is there anything outstanding. Is this equipment ready to go back in service

    • Pass
    • Flag
    • Fail

    Completed by.

    Sign off.

    Click here to sign

    Procedure review.

    Is there anything about the above procedure that needs to be changed? Is the procedure accurate and relevant to the task?

    Does this procedure require any changes?

    • Pass
    • Flag
    • Fail
Source: Impact Fertilisers - Manufacturing (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.