JLG Vertical Mast 30AM: Daily Walk-Around Inspection
As with all heavy equipment, it’s important to inspect and maintain your telehandlers to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.
JLG Vertical Mast 30AM: Daily Walk-Around Inspection
As with all heavy equipment, it’s important to inspect and maintain your telehandlers to ensure they’re running efficiently and improving your productivity. This checklist will help you in inspecting these machines at the start of every day, at shift changes and any time a new operator takes over the machine.
Front Caster Wheels
Rear Wheels
Tiltback Wheels
Base Frame
Tilt Back Assembly
Battery/Charger Box Assembly
Outrigger Interlock Indicator LED’s
Outrigger Sockets
Outrigger Beams
Motor/Pump/Reservoir Power Unit
Manual Release Control Valve
Ground Controls
Mast Assembly
Platform Rail Installation
Platform Assembly
Platform Controls
Source: MaintainX (Community Member)