Weekly Fire Alarm Test
The weekly tests need to include checks that the following devices have been triggered and then successfully reset, where applicable:
Panel Indicators, Sounders, Beacons, Fire/Smoke Dampers, Speed Gate Turnstiles, Door Releases, Lifts, Boilers, Fly Tower Smoke Vents, Atrium Roof Lights, Signal Received by Central Monitoring.
(Associated Documents: Fire Alarm Testing Procedures and Fire Alarm Call Point List)
Weekly Fire Alarm Test
The weekly tests need to include checks that the following devices have been triggered and then successfully reset, where applicable:
Panel Indicators, Sounders, Beacons, Fire/Smoke Dampers, Speed Gate Turnstiles, Door Releases, Lifts, Boilers, Fly Tower Smoke Vents, Atrium Roof Lights, Signal Received by Central Monitoring.
(Associated Documents: Fire Alarm Testing Procedures and Fire Alarm Call Point List)
Name of Tester(s)
Test Date
Prior to Testing
Monitoring Station Disabled
Length of Monitoring Disablement
Have colleagues been informed that the test will be commencing shortly?
Fire Alarm Panel
Which Fire Alarm Panel will be used during testing?
Any Faults on the Fire Alarm Panel?
Theatre Isolation Keys Activated?
If Yes, which areas?
Fire Alarm Call Point
Call Point Asset ID
Call Point Asset Location
Picture of Call Point
Add or drag pictures
Call Point Activated Alarm
Call Point Reset to Normal
Sounders (Audible Alarms)
Comments: (State all Heard and Quiet areas)
Beacons (Visual Alarms)
Comments: (State all Visual and Non Visual areas)
Fire Smoke Dampers
Did Fire Smoke Dampers Activated on Alarm?
Fire Smoke Dampers Restored to OPEN:
Speedgate (Turnstiles)
Did Left Gate (Student Services) open?
Did Centre Gate open?
Did Right Gate (DDA/Wide Lane) open?
Access Control (Salto)
Did Salto Doors deactivate during testing?
Door Holders
Did Door Holders release and doors close during Fire Alarm?
Stairwell 2 Doors on Level 1, 2 & 3
Automatic Doors
Do Foyer DDA Auto Doors power down?
These doors do not automatically open. But power down to allow for ease of exiting
Do the Automatic Doors on Stairwell 2 close and power down to allow free flow access?
Lifts
Lift 1 (Left Hand Passenger)
ALL LIFTS RETURN TO GROUND AND DOORS OPEN, UNLESS FIRE ALARM IS SET OFF ON GROUND AND WILL DEFAULT TO LEVEL ONE
Lift 2 (Right Hand Passenger)
ALL LIFTS RETURN TO GROUND AND DOORS OPEN, UNLESS FIRE ALARM IS SET OFF ON GROUND AND WILL DEFAULT TO LEVEL ONE
Lift 3 (Goods Lift)
ALL LIFTS RETURN TO GROUND AND DOORS OPEN, UNLESS FIRE ALARM IS SET OFF ON GROUND AND WILL DEFAULT TO LEVEL ONE
Lift 4 (Studio Block)
ALL LIFTS RETURN TO GROUND AND DOORS OPEN, UNLESS FIRE ALARM IS SET OFF ON GROUND AND WILL DEFAULT TO LEVEL ONE
Smoke Vents
Did the Mack Theatre North Vent Open?
Did the Mack Theatre South Vent Open?
Did the Atrium West Side Vents Open?
Did the Atrium East Side Vents Open?
Did the Stairwell 1 Vent Open?
Did the Stairwell 2 Vent Open?
Boilers and Plant
Did the Gas Isolation Supply system activate?
Did All Boilers Shutdown?
Please select the Boilers that needed to be reset
Did all other Plant/Machinery shutdown? Such as Air Handling Units if observed
Radios
Did Digital Radios received the alarm signal?
Checklist to complete
Complete Test Submission on to TIO Fire Logbook
Reset Unit 4 Fire Alarm Panel
Completion
I agree that all the above testing in complete and recorded accurately
Signature
Click here to sign
Source: Mountview (Community Member)