Back

Mamata Vega 610 Plus Inspection

Periodic maintenance, a time-tested method for managing assets, plays a vital role in delivering smooth operations and minimizing disruptions. Through regular upkeep at scheduled times, businesses can extend the lifespan of their equipment, cut down on repair expenses, and enhance efficiency.
Plascon
10/10/2024

Mamata Vega 610 Plus Inspection

Periodic maintenance, a time-tested method for managing assets, plays a vital role in delivering smooth operations and minimizing disruptions. Through regular upkeep at scheduled times, businesses can extend the lifespan of their equipment, cut down on repair expenses, and enhance efficiency.

    Look over the overall appearance of the machine.

    • Pass
    • Flag
    • Fail

    Inspect the condition of the nip and dancer rollers.

    • Pass
    • Flag
    • Fail

    Drain the air tank and regulators filters

    • Pass
    • Flag
    • Fail

    Inspect the air lines for any leaks or pinch markings.

    • Pass
    • Flag
    • Fail

    Inspect the condition and tension of timing belts

    • Pass
    • Flag
    • Fail

    Inspect the Teflon and heater heads for damage.

    • Pass
    • Flag
    • Fail

    Inspect the wire cables to each of the heads for exposed wire or fraying.

    • Pass
    • Flag
    • Fail

    Check for bearing wear and metal debris on or around rollers.

    • Pass
    • Flag
    • Fail

    Grease all grease points around the machine.

    • Pass
    • Flag
    • Fail

    Look for any water leaks on and around the machine.

    • Pass
    • Flag
    • Fail

    Verify that all the estops and light curtains are working properly.

    • Pass
    • Flag
    • Fail

    Verify that all the temperature controllers are working and displaying correct temperature.

    • Pass
    • Flag
    • Fail

    Change all air media filters on the electrical junction boxes.

    • Pass
    • Flag
    • Fail

    Remove cover and apply light coat of food grade grease to feedscrew on the unwinders.

    • Pass
    • Flag
    • Fail

    Inspect cutting sheer blade for damage and proper adjustment.

    • Pass
    • Flag
    • Fail

    Clean the static eliminator electrode with nylon brush to clear build up.

    • Pass
    • Flag
    • Fail

    Notes and observation of machine.

    Tools cleared

    • Yes
    • No
    • N / A

    Cleaned, Cleared for Production.

    • Yes
    • No
    • N / A
Source: Plascon (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.