Back

Annual Lockout/Tagout Audit Form

This procedure involves an annual audit of the lockout/tagout process, where an auditor observes an authorized employee performing the procedure. The audit includes gathering general information, reviewing specific inspection questions, and determining if the procedure is adequate or if corrective actions are needed.
Peoria Production Solutions
03/03/2025

Annual Lockout/Tagout Audit Form

This procedure involves an annual audit of the lockout/tagout process, where an auditor observes an authorized employee performing the procedure. The audit includes gathering general information, reviewing specific inspection questions, and determining if the procedure is adequate or if corrective actions are needed.

    General Information

    Building or Location

    Intended Use

    Equipment Name

    Asset Number(s)/ Equipment ID(s)

    Name of Auditor

    Auditor Signature and Date

    Click here to sign

    Authorized Employee Name

    Authorized Employee Signature and Date

    Click here to sign

    Inspection Review Questions

    Does the authorized employee understand how/where to access the lockout/tagout procedure?

    • Yes
    • No
    • N / A

    Was the equipment or system properly shutdown at each hazardous energy source?

    • Yes
    • No
    • N / A

    Did the authorized employee apply locks, devices, and tags to each energy isolation device?

    • Yes
    • No
    • N / A

    Did the authorized employee apply warning tags to each energy isolation device identifying their name, department or shop, and contact information?

    • Yes
    • No
    • N / A

    Did the authorized employee properly dissipate or control hazardous energy?

    • Yes
    • No
    • N / A

    Are the verification methods effective and complete prior to starting servicing and maintenance (i.e., attempt restart, drain/bleed, check gauges, etc.)?

    • Yes
    • No
    • N / A

    Did the authorized employee understand their responsibilities under the procedure?

    • Yes
    • No
    • N / A

    Were all steps in the procedure effective to safely shutdown and lockout/tagout hazardous energy to the equipment or system?

    • Yes
    • No
    • N / A

    Results

    The lockout/tagout procedure is adequate and provides the necessary protection with no corrective actions needed.

    • Yes
    • No
    • N / A

    List the required corrective actions if any

Source: Peoria Production Solutions (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.