Back

W-JET-2W-L8

Waterjet maintenance involves the continuous process of checking, repairing, and servicing operating equipment to ensure businesses can function without interruption.
MaintainX
05/15/2024

W-JET-2W-L8

Waterjet maintenance involves the continuous process of checking, repairing, and servicing operating equipment to ensure businesses can function without interruption.

    Safety First

    Equipment information for l8 waterjet's can be found in manual's located in waterjet room.

    7X1

    HOURS OF SERVICE

    Check for water in hydraulic fluid

    • Pass
    • Flag
    • Fail

    Check level of hydraulic oil and oil filter indicator with unit running

    • Pass
    • Flag
    • Fail

    Check filter banks for pressure differential, replace filters if over 15 psi

    • Screenshot2024-05-09at12.58.55PM.png
    • Pass
    • Flag
    • Fail

    7X2

    HOURS OF SERVICE

    Check for water in hydraulic fluid

    • Pass
    • Flag
    • Fail

    Check level of hydraulic oil and oil filter indicator with unit running

    • Pass
    • Flag
    • Fail

    Check filter banks for pressure differential, replace filters if over 15 psi

    • Screenshot2024-05-09at12.58.55PM.png
    • Pass
    • Flag
    • Fail

    Booster Pump

    Visually check for leaks

    • Pass
    • Flag
    • Fail

    Inspect belt, replace as needed

    • Pass
    • Flag
    • Fail

    Catch Tanks

    Production helper

    Slitter and Crosscut

    With intensifier running check all swivels and manual on/off valves for leaks; ensure blue thread sealant has been used on all connections and they are tight.

    • Pass
    • Flag
    • Fail

    With intensifier running check all slitter heads on/off valves for leaks

    • Pass
    • Flag
    • Fail

    With intensifier running check all crosscut heads on/off valves for leaks

    • Pass
    • Flag
    • Fail

    With intensifier running check all orifices for wear

    • Pass
    • Flag
    • Fail

    Check all gaurds for secure mounting

    • Pass
    • Flag
    • Fail

    Inspect each head on cross cut for excessive movement, repair as needed

    • Pass
    • Flag
    • Fail

    Check all pneumatic solenoids

    • Pass
    • Flag
    • Fail

    Inspect for air leaks, repair as needed

    • Pass
    • Flag
    • Fail

    Check limit switches, v wheels, tracks. and clean (clean tracks with emry cloth)

    • Pass
    • Flag
    • Fail

    Check each head on slitter for excessive movement, repair as needed

    • Pass
    • Flag
    • Fail

    Check all e stops for proper operation

    • Pass
    • Flag
    • Fail

    Check proximity switches on slitter heads by homing.

    • Pass
    • Flag
    • Fail

    Check proximity switches on doors by raising and lowering carrige.

    • Pass
    • Flag
    • Fail

    Chiller

    Crosscut linear system

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.