Pacific Energy (SWP) Pte Ltd 30070: Weekly Groundwater Inspection
Regular testing is advantageous because it can identify existing problems, ensure the water is suitable for its intended use, track changes over time, and determine the effectiveness of a potential treatment system
Pacific Energy (SWP) Pte Ltd 30070: Weekly Groundwater Inspection
Regular testing is advantageous because it can identify existing problems, ensure the water is suitable for its intended use, track changes over time, and determine the effectiveness of a potential treatment system
Date:
Inspected By:
MW1 - Workshop - 2.540mm
MW2 - Lab - 2.730mm
MW3 - TM’s office - 2.830mm
MW4 - Gate 2 - 2.910mm
MW5 - Between G2 & G3 - 3.120mm
MW6 - Interceptor 4 - 2.170mm
MW7 - SU4 bund wall - 3.914mm
MW8 - SU3 bund valve - 2.677mm
MW9 - Backload pump - 2.865mm
MW10 - SU5 tankship valve - 2.880mm
MW11 - SU1 inlet valve - 2.890mm
MW12 - SU2 outlet valve - 1.565mm
MW13 - Debunker tank - 1.620mm
MW14 - Drum Platform - 1.820mm
MW15 - Car park 1 - 2.930mm
MW16 - Truck Stop - 1.760mm
MW17 - Shankar Yard Gate - 1.210mm
MW18 - Training Room stairs - 2.470mm
MW19 - Lube store - 2.350mm
MW20 - Assembly area - 3960mm
MW21 - SU2 water drain line - 2.540mm
NOTE: No Longer accessible wells are due to Terminal Structural Developments
Source: MaintainX (Community Member)