HomeIndustries Use Cases PricingResources Book a TourLog In to MaintainXIndustries Use Cases PricingResources Book a TourLog In to MaintainX Back Manufacturing / Industrial • MaintenanceCleaver Brooks 4WG 750-212 Weekly MaintenanceMaintainX04/26/2021Cleaver Brooks 4WG 750-212 Weekly MaintenanceFiring Rate ControlVerify factory settingsIgniterMake visual inspectionCheck flame signal strength.Pilot and Main Fuel Valves Open limit switch.Make audible and visual checkCheck valve position indicators check fuel metersFlame Failure ControlsClose manual fuel supply for: pilotmain fuel cock and/or valve(s)Check safety shutdown timing. Record in log.Flame Signal Strength ControlsRead and log the flame signal for both pilot and main flame.Notify Service if readings are very high, very low, or fluctuatingLinkages Check all burner linkages for tightness. Tighten if required.Source: Cleaver Brooks
Back Manufacturing / Industrial • MaintenanceCleaver Brooks 4WG 750-212 Weekly MaintenanceMaintainX04/26/2021Cleaver Brooks 4WG 750-212 Weekly MaintenanceFiring Rate ControlVerify factory settingsIgniterMake visual inspectionCheck flame signal strength.Pilot and Main Fuel Valves Open limit switch.Make audible and visual checkCheck valve position indicators check fuel metersFlame Failure ControlsClose manual fuel supply for: pilotmain fuel cock and/or valve(s)Check safety shutdown timing. Record in log.Flame Signal Strength ControlsRead and log the flame signal for both pilot and main flame.Notify Service if readings are very high, very low, or fluctuatingLinkages Check all burner linkages for tightness. Tighten if required.Source: Cleaver Brooks