Generac Containerized Generators MCG1000: Every 50 Hours Maintenance
This procedure will help maintian your equipment avoiding safety hazards. In order for the equipment to operate safely and properly over a long period of time, the break-in period maintenance maintenance and occasional repairs are necessary.
Generac Containerized Generators MCG1000: Every 50 Hours Maintenance
This procedure will help maintian your equipment avoiding safety hazards. In order for the equipment to operate safely and properly over a long period of time, the break-in period maintenance maintenance and occasional repairs are necessary.
MAINTENANCE SCHEDULE
Periodic inspection, service, and maintenance of this unit is critical in ensuring its reliable operation. The following is the manufacturer’s recommended maintenance schedule. The maintenance items will need to be performed more frequently if the unit is used in severe applications (such as very high or very low ambient conditions or extremely dirty/dusty environments). Use the unit hour meter or calendar time, whichever occurs first, from the previous maintenance interval to determine the next required ma
Be sure to follow all applicable safety and caution statements found in the unit operating manual or engine service/ maintenance manual before performing any maintenance checks or service.
This maintenance schedule reflects the minimum tasks that need to be accomplished to ensure that the unit remains operational. Some of the tasks can be performed by an authorized operator and others must be performed by an Authorized/Qualified Service Dealer Technician.
Note: An authorized operator is one who has been trained by a Manufacturer Authorized Service Dealer in the proper operation and inspection of this generator set.
Use the schedule in the following table as a guide for regular maintenance intervals. For additional or replacement copies of the engine operator’s manual, contact an authorized dealer in your area.
Basic Maintenance Procedure:
Source: MaintainX (Community Member)