Scotsman Prodigy Flaked and Nugget Ice Machines (291-845) Planned Maintenance: Semi-Annual
Preventive Maintenance (PM) is the key to maximum running efficiency, less down time, and longer life out of an ice machine. Use this checklist for the primary items that need to be checked during the semi-annual preventive maintenance.
Scotsman Prodigy Flaked and Nugget Ice Machines (291-845) Planned Maintenance: Semi-Annual
Preventive Maintenance (PM) is the key to maximum running efficiency, less down time, and longer life out of an ice machine. Use this checklist for the primary items that need to be checked during the semi-annual preventive maintenance.
Ice Machine Water System, including water filters:
Bin Liner Cleaning and Sanitizing:
Air Filter Cleaning:
Remote Condenser Coil Cleaning:
For the Owner or Operator - several items can be “do it yourself” procedures:
Source: MaintainX (Community Member)