PM Inspection Step 2 mesin Cut Saw (every 3 months)
This procedure is for checking the machine for loose or missing fasteners and that all parts are secure to avoid injury.
PM Inspection Step 2 mesin Cut Saw (every 3 months)
This procedure is for checking the machine for loose or missing fasteners and that all parts are secure to avoid injury.
Electrical
Fungsional Instrument Panel Control
Kondisi Visual dan Fungsional Komponen Listrik
Kelistrikan Motor
Mechanical
Bearing Sliding
Sliding
Motor Bearing
Source: Maintenance SRP (Community Member)