Back

PM Inspection Step 2 mesin Cut Saw (every 3 months)

This procedure is for checking the machine for loose or missing fasteners and that all parts are secure to avoid injury.
Maintenance SRP
05/27/2022

PM Inspection Step 2 mesin Cut Saw (every 3 months)

This procedure is for checking the machine for loose or missing fasteners and that all parts are secure to avoid injury.

    Electrical

    Fungsional Instrument Panel Control

    Kondisi Visual dan Fungsional Komponen Listrik

    Kelistrikan Motor

    Mechanical

    Bearing Sliding

    • Pass
    • Flag
    • Fail

    Sliding

    • Pass
    • Flag
    • Fail

    Motor Bearing

    • Pass
    • Flag
    • Fail
Source: Maintenance SRP (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.