ORGANIC SCAVENGER SIX MONTHLY
Use this guide to the visual checks of any leaks, and the overall performance of your equipment.
ORGANIC SCAVENGER SIX MONTHLY
Use this guide to the visual checks of any leaks, and the overall performance of your equipment.
ASSISTANCE OR FURTHER WORKS REQUIRED
VISUAL CHECK FOR ANY LEAKS
FEED PRESSURE (Bar)
FEED CHLORIDE (PPM)
OUTLET CHLORIDE PPM
CHLORIDE DIFFERENTIAL (Outlet - Inlet = differential) negative number is fail
Anion in Chloride Form will exchange chloride for organics. Equal or lower chloride on outlet could mean resin is fouled
BACKWASH FLOW RATE (m3/hr)
BRINE DRAW FLOW RATE (l/min)
BRINE DRAW VOLUME (ltr)
MOTIVE FLOW VOLUME (l/min)
SLOW RINSE FLOW RATE (l/min)
FAST RINSE FLOW RATE (l/min)
BACKWASH TIME (min)
BRINEWASH TIME (min)
FAST RINSE TIME (min)
REFILL TIME (min)
OUTLET PRESSURE (bar)
PRODUCT FLOW RATE (m3/hr)
CONTROL VALVE PISTON CHECK
REMOVE CONTROL VALVE PISTONS, CLEAN, GREASE, REPLACE AND VISUAL CHECKS
Source: HYDRA-CLEAR PROCESS WATER LTD (Community Member)