Allow Steel –Chain And Wire Rope Slings Pre-Use Operation Checklist
By using this pre-use checklist, it will help you minimize project delays and unproductivity, lower maintenance costs, and reduce recurring problems.
Allow Steel –Chain And Wire Rope Slings Pre-Use Operation Checklist
By using this pre-use checklist, it will help you minimize project delays and unproductivity, lower maintenance costs, and reduce recurring problems.
Inspection Date
Inspector (print/sign name)
Alloy Steel-chain slings must be marked with the following: (List details below)
Size
Manufacturer’s grade
Rated load and angle on which the rating is based.
Reach
Numbers of legs
Sling manufacturer
Inspection due date label by hoist and rigging inspector
Inspection:
Missing or illegible sling identification
Link-by-link inspection
Uneven lengths when sling legs are hanging free
Rings and hooks
Deformed master links or coupling links
Hooks, twisted more than 10° or opened more than 15%
Hooks, Cracked or damaged
Homemade links, makeshift fasteners formed from bolts, rods, and the like, or other nonstandard attachments
Makeshift or field-fabricated hooks on steel-chain slings