PM.I (A ZONE) INFEED
The PM.I Asset Check Procedure outlines the systematic inspection and maintenance of machinery components to ensure optimal functionality and safety.
PM.I (A ZONE) INFEED
The PM.I Asset Check Procedure outlines the systematic inspection and maintenance of machinery components to ensure optimal functionality and safety.
Date:
Engineer completing PM.I
Engineer completing PM.I
Machine safety
Where guarding is to be removed - correct maintenance procedures are to be followed
LOTO - has been completed
A00 infeed
Check condition of drive chain
Check condition of drive chain sprockets
Check condition of frame and securing bolts
Check condition of guarding
Check condition of photocell A00_EBO
Check Condition of photocell VA1_EBO
Check condition of Zone + global stop
Check condition of VAZ infeed barrier
Check condition of 3 transfer chains
Check tension of all 3 chains
Check wear strips
Remove guarding and check return wear strips
Check all sprockets for wear
Check condition of light guard
Check A00 connections
A01 infeed transfer conveyor
Check drive chain
Check condition of frame
Check condition of chains
Check tension of all 3 chains
Check drive chain sprockets
Check wear strips
Remove guarding and check return wear strips
Check all sprockets for wear
Check photocell A01_EBO
Engineer sign off`s
Engineer - PM.I have been completed to correct standard
Click here to sign
Operation sign off`s
Manager/lead/ops - Machine been left in clean and runnable condition
Click here to sign
AFTER COMPLETING PM.I PLEASE CREATE CORECTIVE ACTION W/O