BREAKDOWN/FAULT REPORT
Use this procedure for proper documentation of your machine findings and inspection.
BREAKDOWN/FAULT REPORT
Use this procedure for proper documentation of your machine findings and inspection.
Date and Start Time:
Completion Time
Equipment Name: (Also select the equipment Under Asset)
Operator:
Shift:
Run hour for Machine with Fault (Leave blank if machine has no Meter)
Meter name
Unit
Downtime (min)
Fault Description/Symtoms/Problem Summary:
Photo of Fault (where applicable)
Add or drag pictures
State the Issue reported by Production:
RESULTS OF FAILURE:
Repair Description/Diagnostic steps performed (to include troubleshooting steps):
Corrective Actions performed:
Root Cause (Ask yourself the 5WHY’s):
Recommendations (failure prevention & long-term action):
Permanent fix to Fault? Any Repair that requires follow up Please mark Fail and add a comment.
DONE BY: SIGNATURE
Click here to sign
DONE BY: SIGNATURE
Click here to sign
Source: Kiss Baking Jamaica (Community Member)