Rational Oven PM 100 Hours/ 6 Months Maintenance
The Bosch ACS 863 Air Conditioner Service 100 Hours/ 6 Months Maintenance form focuses on your vacuum pump oil maintenance. This form is divided into different categories with individual checklists for thorough inspection ensuring quality performance from your air conditioners.
Rational Oven PM 100 Hours/ 6 Months Maintenance
The Bosch ACS 863 Air Conditioner Service 100 Hours/ 6 Months Maintenance form focuses on your vacuum pump oil maintenance. This form is divided into different categories with individual checklists for thorough inspection ensuring quality performance from your air conditioners.
NOTE: Vacuum pump oil must be changed with every filter change, every 100 hours pump runs or more often as necessary.
If the the machine displays
WARMING OIL FOR DRAIN
If the oil is already warm, the display shows:
NOTE: In case it is necessary to add more oil, repeat steps 8, 9, 10, 12, 13, 14 and 15 for add oil.
Figure 1-7. Oil Ports
CAUTION: To prevent personal injury, do NOT operate the machine at any other time without the oil fill port cap installed, because the vacuum pump is pressurized during normal operation.
NOTE: Review the laws and regulations in your jurisdiction to determine correct disposal proce- dures for pump oil. It is the responsibility of the user to determine if a material is a hazardous waste at the time of disposal. The user must ensure complian
Source: PRIDE ENGINEERING SERVICES LLC (Community Member)