Yale Forklift ERC065RG: Every 8 Hours or Daily Maintenance
Use this maintenance checklist and follow the schedule interval for the proactive and preventive maintenance of your forklifts. This has been proven to lower costs by catching small service issues before they blossom into giant repair headaches.
Yale Forklift ERC065RG: Every 8 Hours or Daily Maintenance
Use this maintenance checklist and follow the schedule interval for the proactive and preventive maintenance of your forklifts. This has been proven to lower costs by catching small service issues before they blossom into giant repair headaches.
Legends:
X: Indicates visual inspection, Testing, Adjusting as Required
CIL: Check indicator light during operation
O: Indicates drain and fill
R: Indicates Replacement
IR: Initial Replacement
CO: Complete overhaul
Safety and operational checks (before each shift) only the 8 hour checks are to be done by the operator. Have a qualified mechanic correct all problems.
Maintenance Procedure: X
Internal checks:
Maintenance procedure: X
Operator's Compartment:
Maintenance procedure: X
Maintenance procedure: CIL
Controls (Start lift truck) - immediately check noises that are not normal.
Maintenance procedure: X and CIL
Maintenance procedure: X
Gauges:
Maintenance Procedure: X
Hydraulic System Check:
Maintenance Procedure: X
Maintenance Procedure: IR
Mast, carriage and attachment check
Maintenance Procedure: X
Electrical System
Maintenance Procedure: CIL
Road test and load test the lift truck
Maintenance procedure: X
Source: MaintainX (Community Member)