FORM 1B-PILING
QUALITY INSPECTION FORM FOR PILING SETTING OUT
FORM 1B-PILING
QUALITY INSPECTION FORM FOR PILING SETTING OUT
Project Name:
Block & PTD No:
1. Land Lot Boundary Points
1.1 Land Lot Boundary Points
Piling contractor’s licensed surveyor must confirm that land lot boundary points as demarcated with boundary markers are consistent with pre-computation plan and that there are no errors on the land lot boundary markers.
2. Piling Points
2.1 Piling Points Markers
Piling points must be set out by piling contractor’s licensed surveyor with clear piling point markers
2.2 Numbers
Numbers of piling points must be consistent with the approved piling plan by appointed structural engineer.
2.3 Alignment
Alignment of piling points must be consistent with the pre-computation plan by appointed licensed surveyor
2.4.1 Position
Position of piling points must be consistent with the approved piling plan by appointed structural engineer.
2.4.2 Position
Position of piling points must be checked against land lot boundary points to ensure that piling points positions are accurate.
Source: MMX (Community Member)