Back

FORM 1B-PILING

QUALITY INSPECTION FORM FOR PILING SETTING OUT
MMX
05/31/2023

FORM 1B-PILING

QUALITY INSPECTION FORM FOR PILING SETTING OUT

    Project Name:

    Block & PTD No:

    1. Land Lot Boundary Points

    1.1 Land Lot Boundary Points

    Piling contractor’s licensed surveyor must confirm that land lot boundary points as demarcated with boundary markers are consistent with pre-computation plan and that there are no errors on the land lot boundary markers.

    • Yes
    • No
    • N / A

    2. Piling Points

    2.1 Piling Points Markers

    Piling points must be set out by piling contractor’s licensed surveyor with clear piling point markers

    • Yes
    • No
    • N / A

    2.2 Numbers

    Numbers of piling points must be consistent with the approved piling plan by appointed structural engineer.

    • Yes
    • No
    • N / A

    2.3 Alignment

    Alignment of piling points must be consistent with the pre-computation plan by appointed licensed surveyor

    • Yes
    • No
    • N / A

    2.4.1 Position

    Position of piling points must be consistent with the approved piling plan by appointed structural engineer.

    • Yes
    • No
    • N / A

    2.4.2 Position

    Position of piling points must be checked against land lot boundary points to ensure that piling points positions are accurate.

    • Yes
    • No
    • N / A
Source: MMX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.