JUNGHEINRICH EJC 220 Pedestrian Pallet Stacker 50 Hours/ Weekly
The JUNGHEINRICH EJC 220 Pedestrian Pallet Stacker 50 Hours/ Weekly preventive maintenance form focuses on the brakes, electrics, energy supply, battery maintenance and checking of wheels for wear and damage. This form will help you maintain your equipment's safety and performance.
JUNGHEINRICH EJC 220 Pedestrian Pallet Stacker 50 Hours/ Weekly
The JUNGHEINRICH EJC 220 Pedestrian Pallet Stacker 50 Hours/ Weekly preventive maintenance form focuses on the brakes, electrics, energy supply, battery maintenance and checking of wheels for wear and damage. This form will help you maintain your equipment's safety and performance.
Brakes
Electrics
2.2 Test warning and safety device
Energy supply
4.1 Battery visual inspection
Battery maintenance:
Battery maintenance:
4.3 Check :
Travel
5.2 Test
5.3 Check wheels for wear and damage
Hydraulic operation
7.8 Test hydraulic system operation
7.9 Check that :
7.10 Check:
7.11 Check the hydraulic oil level
There are markings on the hydraulic reservoir. The oil level must be checked when the load forks are lowered.
If necessary add hydraulic oil of the correct grade (see Section 5.1) – see table.
Assembly is the reverse order.
Agreed performance levels
Source: Jungheinrich