Engineering Shift Checklist
Use this complete checklist for the NCC Hope Center Mechanicals.
Engineering Shift Checklist
Use this complete checklist for the NCC Hope Center Mechanicals.
Elevator Room
AC Unit Operating?
Any excessive oil on floor?
Any Bulbs out?
Technician name and date
Hot Water Storage
5th Floor High side temp?
5th Floor low side temp?
3rd Floor low side temp?
3rd Floor High side temp?
Technician name and date
Boiler room Check
6th Floor high side OK?
6th Floor Low side OK?
5th Floor low side OK?
5th Floor high side OK?
Technician Name and date
Fire Panel Check
Any Troubles?
Technician Name and date
Main Electrical Room
Heater Working?
Exhaust Fan off winter/ on Summer
Technician Name and date
Fire Pump Room
Dry system air pressure?
Garage dry press (ballroom stairwell)
Technician name and date
Domestic Water pumps
it is located in the office next to the employee exit.
Controls on auto?
Pump 1 running?
Pump 2 running?
Any Leaks ?
Header PSI?
Technician name and date
Source: Engineering (Community Member)