Daikin Roofpak Heating and Cooling IM 738-2: Semi-Annual Maintenance
The semi-annual maintenance procedure is for checking and replacing your equipment's R7/R8 enclosure exhaust air filter. If installed in an appropriate environment, the drive requires very little maintenance. This procedure lists the routine maintenance intervals recommended by Daikin.
Daikin Roofpak Heating and Cooling IM 738-2: Semi-Annual Maintenance
The semi-annual maintenance procedure is for checking and replacing your equipment's R7/R8 enclosure exhaust air filter. If installed in an appropriate environment, the drive requires very little maintenance. This procedure lists the routine maintenance intervals recommended by Daikin.
Periodic Service and Maintenance
Source: MaintainX (Community Member)