Back

Refrigeration: Freezer Safety Inspection

Inspect for ice build-up on or around 270 (18X15) sprinkler heads, man, and rollup door. Ensure exit signs are in place and illuminated. Inspect for rack damage.
Cold Locker Processing and Storage
01/13/2023

Refrigeration: Freezer Safety Inspection

Inspect for ice build-up on or around 270 (18X15) sprinkler heads, man, and rollup door. Ensure exit signs are in place and illuminated. Inspect for rack damage.
    • IMG_6814.HEIC
    • IMG_6815.HEIC
    • IMG_6816.HEIC
    • IMG_6812.HEIC
Source: Cold Locker Processing and Storage (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.