Back

Konig Pre-Proofer Swings Monthly Preventive Maintenance

Use the complete checklist below for the monthly preventive maintenance of all swings in the pre-proofer.
Cusano's Bakery
06/20/2023

Konig Pre-Proofer Swings Monthly Preventive Maintenance

Use the complete checklist below for the monthly preventive maintenance of all swings in the pre-proofer.

    Konig Operations Manual

    Click here to sign

    Section #1

    Inspection of Swings & Mesh cups

    • Screenshot2023-06-20092041.png

    Removing and replacing the swings:

    When removing swings, always ensure that some swings remain in their original position in the unit. Any swings which remain to be installed may then be positioned without any difficulty in the 2nd hole on the swings chain. Otherwise look for the stop bolt of the chain, the first swing must then be inserted into the first hole after the bolt. Then insert each of the other swings into the 2nd space. When hanging in the swings, ensure that the side of the swing with the guide nose (3) always faces toward

Source: Cusano's Bakery (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.