CE-2500-HVE Band Sealer 30 Day Inspection
Daily maintenance or replacement of parts for your band sealer will keep your machine in its optimal condition.
CE-2500-HVE Band Sealer 30 Day Inspection
Daily maintenance or replacement of parts for your band sealer will keep your machine in its optimal condition.
30 Day Inspection. Use Super Lube H1 grease.
Replace Teflon belts if needed
Inspect rubber belts
Check both heating elements for proper heating
Clean and blow out machine thoroughly including behind the blocks
Check all of the rollers that drive the belts and that emboss or print for excessive play side to side generally you will see a belt walking off or riding up or down as a symptom.
Check gears on the inside of machine after dusting clean off old grease and apply new
Check all electrical connections for loose junctions and all ice cube relays for corrosions or discolored connectors
Check motor brushes for wear
Check motor gear head for movement and put oil in via the plastic nut installed into the top
Check the conveyor belt, table and adjusters for wear and proper use
Check and grease the chain in the conveyor
Check conveyor rollers for wear and bearing health
Source: AZ Revlon (Community Member)