Back

Omnizone™ Constant Volume Water-Cooled Cooling Unit 50BVJ: 6 Months Maintenance

This procedure has the recommended guidelines for the bi-monthly maintenance of your unit. The given instruction is only a recommended guideline.
MaintainX
09/15/2022

Omnizone™ Constant Volume Water-Cooled Cooling Unit 50BVJ: 6 Months Maintenance

This procedure has the recommended guidelines for the bi-monthly maintenance of your unit. The given instruction is only a recommended guideline.

    Fan Motor Lubrication

    The fan motor was properly lubricated at the time of manufacture.

    IMPORTANT: PILLOW BLOCK STYLE FAN BEARINGS: Bearings have been prelubricated with high quality grease. Bearings must be relubricated once every 6 months or every 2500 hours of operation, whichever comes first.

    Fan Bearing Lubrication

    Inspect the fan bearings for proper lubrication every 6 month or 2500 hours of operation, whichever comes first. Standard units have grease fittings on the fan shaft bearings, located on each side of the blower wheel.

Source: MaintainX (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.