Back

AquaEdge® High-Efficiency Semi-Hermetic Centrifugal Chiller Unit 19XR | Scheduled Maintenance

This annual procedure focuses on different kinds of your equipment's filters and in-track baffles. This will help ensure that your unit performs at it's peak for a long period of time.
MaintainX
09/09/2022

AquaEdge® High-Efficiency Semi-Hermetic Centrifugal Chiller Unit 19XR | Scheduled Maintenance

This annual procedure focuses on different kinds of your equipment's filters and in-track baffles. This will help ensure that your unit performs at it's peak for a long period of time.

    Establish a regular maintenance schedule based on your actual chiller requirements such as chiller load, run hours, and water quality. The time intervals listed in this section are offered as guides to service only

      Service Ontime

      Inspect the Control Panel

      WARNING: Ensure power to the starter is isolated when cleaning and tightening connections inside the starter enclosure. Failure to disconnect power could result in electrocution. The oil filter housing is at a high pressure. Relieve this pressure slowly. Failure to do so could result in serious personal injury.

      Source: MaintainX (Community Member)

      Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.