Doosan D15 S-5 Pneumatic Forklift 500 Hours /3 Months
The Doosan D15 S-5 Pneumatic Forklift 500 Hours /3 Months is a preventive maintenance form done every quarter that keeps your forklift in prime working condition. Maximize your forklifts capabilities by consistently performing maintenance on a quarterly basis.
Doosan D15 S-5 Pneumatic Forklift 500 Hours /3 Months
The Doosan D15 S-5 Pneumatic Forklift 500 Hours /3 Months is a preventive maintenance form done every quarter that keeps your forklift in prime working condition. Maximize your forklifts capabilities by consistently performing maintenance on a quarterly basis.
You must read and understand the warnings and instructions contained in the Safety section of this manual, before performing any operation or maintenance procedures.
Belts - Check, Adjust
NOTICE: Failure to loosen the alternator mounting bolt will cause excessive stress and break the alter- nator mounting ear.
Tilt Cylinders - Check, Adjust, Lubricate
Chassis Pivot Eyebolts - Lubricate
Mast Pivot Eyes-Lubricate
Cylinder Rod Extension-Adjust
NOTE : The following description is for forward tilt. For cylinder rod back tilt, the collar should be stationary by the tilt eye.
If it is not, the O-ring inside the collar may need to be replaced. To adjust back tilt, spacers must be added or removed.
Mast Hinge Pin - Lubricate
Crosshead Roller - Inspect
Parking Brake - Test, Adjust
See topic, “Parking Brake - Test, Adjust” in “First 50-100 Service Hours.”
Inching & Braking Control Shaft - Lubricate
Drive Axle Oil (OCDB) - Change
See topic, “Drive Axle Oil - Change” in the “First 50 - 100 Service Hours”.
Horn & Lights (If Equipped) - Check
Overhead Guard - Inspect
Inspect Vacuum Lines and Fittings (G420F(E) Engine Only)
Fuel Trim Valve(FTV) Inspection (G420F(E) Engine Only)
Inspect Electrical System (G420F(E) Engine Only)
Source: Doosan