Back

Dock Leveler Semi-Annual PM

This approach involves systematic checks, adjustments, and necessary repairs to uphold performance standards, reduce downtime, and enhance the reliability of the dock leveler equipment.
205 Raleigh - Cintas
03/05/2024

Dock Leveler Semi-Annual PM

This approach involves systematic checks, adjustments, and necessary repairs to uphold performance standards, reduce downtime, and enhance the reliability of the dock leveler equipment.

    *** LOTO Confirmation Statement - DO NOT EDIT/REMOVE ***

    All hazardous energy has been isolated using LOTO procedures?

    All potential stored or residual energy has been relieved, disconnected, restrained, lowered, and/or otherwise rendered safe?

    Lock Out Tag Out

    LOTO Performed

    Perform PRCS LOTO

    Click here to sign

    Inspect stripping

    • Pass
    • Flag
    • Fail

    Inspect hardware integrity - springs, brakes, etc

    • Pass
    • Flag
    • Fail
Source: 205 Raleigh - Cintas (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.