Copy - Braun Open Pocket Washer Annual PM
Routine maintenance also protects your business investment because regular upkeep of your machines maximizes their performance. Machines that perform at their best for the long haul means more money in your pocket, highly satisfied customers, fewer chances of major technical repairs, and lower utility costs.
Copy - Braun Open Pocket Washer Annual PM
Routine maintenance also protects your business investment because regular upkeep of your machines maximizes their performance. Machines that perform at their best for the long haul means more money in your pocket, highly satisfied customers, fewer chances of major technical repairs, and lower utility costs.
Lock Out Tag Out
LOTO Performed
Utilize the Cintas ENERGY CONTROL PROGRAM Checklist when applying LOTO.
Check Brake Linings - If applicaple, check brake linings. Replace if needed. Appendix 1
Check Electrical Connections - Check All electrical connections in the Main Control Panel and on the Inverter
Replace shock absorbers - Replace all shock absorbers and date each one
Change fluid & filter - Change hydraulic fluid; install new filter. See Appendix 2.
Test motor - Test electric motor insulation for breakdown. Replace friction tape if damaged. Perform an amp draw.
Chute - Replace the quick exhaust air filter. Braun part number#P02300003. See Appendix 3.
Cleanup - Clean up all tools, parts, and debris from the work area.
Note Repairs Made or Needed. Generate Corrective Work Order for Needed Repairs.
Source: 24P DC Columbus - Cintas (Community Member)