    DESKTOP STUDY

    Shop drawings inclusive of all major connection details submitted to & approved by OIC. All members shall be numbered

    • Yes
    • No
    • N / A

    Welding Procedure Specification (WPS) submitted to and approved by OIC

    • Yes
    • No
    • N / A

    Checked steel grade and size, Hot rolled or Cold-formed?

    • Yes
    • No
    • N / A

    Welders with valid certificate approved by OIC

    • Yes
    • No
    • N / A

    Method of fabrication approved by OIC. Fabricator has the necessary welding facilities and a shelter fabrication yard

    • Yes
    • No
    • N / A

    MATERIAL VERIFICATION & MILL CERTIFICATE

    Correct sizes and dimensions, verified all dimensions, thickness (Flange & Web)

    • Yes
    • No
    • N / A

    Mill/Test certificates submitted to OIC's approval: Steel ex-mills, ex-stocks, bolts and rivets, Electrodes

    • Yes
    • No
    • N / A

    Tested welders' competence to undertake special welding procedures when instructed

    • Yes
    • No
    • N / A

    Material is visually acceptable, no visual defects such as warping, twisting, distortion, damaged sections, pitting

    • Yes
    • No
    • N / A

    All plates and stiffener plate fit-ups are as per construction drawings

    • Yes
    • No
    • N / A

    Steel HEAT number punched/transferred

    • Yes
    • No
    • N / A

    MARKING & CUTTING

    Marking, cutting & steel section dimensions (DxBxL) are within tolerance

    • Yes
    • No
    • N / A

    Steel markings provided

    • Yes
    • No
    • N / A

    All bolt positions & drilling sizes are as per drawing

    • Yes
    • No
    • N / A

    BOLT CONNECTION

    Reconfirmed bolt grade & type, bolt dimension (dia. x length)

    • Yes
    • No
    • N / A

    Washer grade & type

    • Yes
    • No
    • N / A

    Connection joints/splice joints constructed as per drawings

    • Yes
    • No
    • N / A

    Bolts tightened

    • Yes
    • No
    • N / A

    All bolts are with minimum 1.5mm of thread beyond nut

    • Yes
    • No
    • N / A

    Checked defect, e.g. Tilted bolts/holes enlarged by torch cutting. If Yes, submit the report of the remedy action

    • Yes
    • No
    • N / A

    Checked embedment length and arrangement of holding down bolts

    • Yes
    • No
    • N / A

    Location plan provided, please attach to this checklist

    • Yes
    • No
    • N / A

    WELDING CONNECTION

    Size and length of weld according to approved plan and specifications

    • Yes
    • No
    • N / A

    Reconfirmed welding electrode strength complies with specification

    • Yes
    • No
    • N / A

    Checked weld surface is clean & free from dust, rust & scales

    • Yes
    • No
    • N / A

    Welding done by qualified welders, verified their identity

    • Yes
    • No
    • N / A

    Welding procedure as per approved WPS

    • Yes
    • No
    • N / A

    Checked for any welding defects. E.g. undercuts, pits, surface cracks, lack of fusion. If yes, submit the remedy action report

    • Yes
    • No
    • N / A

    Location plan provided, please attach

    • Yes
    • No
    • N / A

    NON-DESTRUCTIVE TEST

    Magnetic Particle IndicationTest (MPI) required for fillet weld.

    • Yes
    • No
    • N / A

    % of weld to be tested:

    Ultrasonic Test (UT) required for fillet weld.

    • Yes
    • No
    • N / A

    % of weld to be tested:

    Penetrate Test (PT) required for fillet weld.

    • Yes
    • No
    • N / A

    % of weld to be tested:

    Ultrasonic Test (UT) required for butt weld.

    • Yes
    • No
    • N / A

    % of weld to be tested:

    Radiographic Test (RT) required for butt weld.

    • Yes
    • No
    • N / A

    % of weld to be tested:

    Remedial action taken for welding test failures

    • Yes
    • No
    • N / A

    PAINTING & GALVANISING

    Checked galvanised steel hot dipped to the specified requirements

    • Yes
    • No
    • N / A

    Checked steel area is thoroughly cleaned, scraped, wire-brushed or sand blasted to specification, free from rust & scale before painting

    • Yes
    • No
    • N / A

    Galvanised steel / Surface painted to contract's specifications

    • Yes
    • No
    • N / A

    Name of SS

    Checked & Signed

    Click here to sign

    Date

    Reviewed Non-compliance

    Date

    Name of OIC

    Verified & Signed

    Click here to sign

    Date

    Reviewed Non-compliance

    Date

    Reference: http://www.mod.gov.bn/pwd/Shared%20Documents/PWDSQMChecklists/Checklist1101%20-%20Structural%20Steelwork%20-%20Fabrication.pdf

    Source: MaintainX (Community Member)

    Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.