Quarterly Thermo Inspection
Check all breakers and switch gear with infrared/thermo camera. Add/modify all descriptors as needed.
Make sure all panels/boxes/breakers are checked in the facility with Fluke Thermal Camera - Mark pass/fail and create a separate work order (if failed) to repair. We are checking for HOTSPOTS which show loose wiring, and/or current faults (high amperage).
Quarterly Thermo Inspection
Check all breakers and switch gear with infrared/thermo camera. Add/modify all descriptors as needed.
Make sure all panels/boxes/breakers are checked in the facility with Fluke Thermal Camera - Mark pass/fail and create a separate work order (if failed) to repair. We are checking for HOTSPOTS which show loose wiring, and/or current faults (high amperage).
600A Furnace CP1
600A Furnace CP2
ACD Degasser PLC
A-Furnace CP
Air Quencher (Line Side)
B-12 PNL
Billet Saw
B-Melt MCC
Caster MCC (Line Side)
Cold Well CP (Line Side)
Conference Room PNL 1 (Line Side)
Conference Room PNL 2 (Line Side)
Contractors PNL #1 (Line Side)
Contractors PNL #2 (Line Side)
Control RM Power PNL (Line Side)
Crane Cabinet (Line Side)
Crane Hot Rails
Crane Hot Rails Disc. (Line Side)
Efficient BLDG CP (Line Side)
Efficient BLDG CP Disc. (Line Side)
EMP Burner PNL
EMP Burner PNL Disc. (Line Side)
EMP Control PNL
Holding Furnace CP
Homo Furnace CP (Line Side)
Homo Furnace Disc. (Line Side)
Lighting PNL
Load Center B
Load Center B (Line Side)
Load Center B MV Disc. 1 (Line Side)
Load Center B MV Disc. 2 (Line Side)
LP1 PNL
MDP-H
MDP-H (Line Side)
MDP-H MV Disc. (Line Side)
MSP XFMR Disc. B (Line Side)
MTCE Shop PNL (Line Side)
PNL B11
PNL B3
PNL B6 Box
Pro Crimp Disc. (Line Side)
Sewage Plant
Tower Pump CP (Line Side)