Welding Inspection Procedure / Checklist

    Stage 1 - Welding Inspection Prior to Welding Work

    Welding symbols and weld sizes clearly specified in drawing and related documents.

    • Pass
    • Flag
    • Fail

    Weld joint designs and dimensions clearly specified in drawings and related documents.

    • Pass
    • Flag
    • Fail

    Weld maps identify the welding procedure specification (WPS) to be used for specific weld joints.

    • Pass
    • Flag
    • Fail

    Dimensions detailed and potential for distortion addressed.

    • Pass
    • Flag
    • Fail

    Welding consumables specified.

    • Pass
    • Flag
    • Fail

    Proper handling of consumables, if any, identified.

    • Pass
    • Flag
    • Fail

    Base material requirements specified (such as the use of impact tested materials where notch ductility is a requirement in low temperature service).

    • Pass
    • Flag
    • Fail

    Mechanical properties and required testing identified.

    • Pass
    • Flag
    • Fail

    Weather protection and wind break requirements defined.

    • Pass
    • Flag
    • Fail

    Preheat requirements and acceptable preheat methods defined.

    • Pass
    • Flag
    • Fail

    Post-weld heat treatment (PWHT) requirements and acceptable PWHT method defined.

    • Pass
    • Flag
    • Fail

    Inspection hold-points and NDE requirements defined.

    • Pass
    • Flag
    • Fail

    Additional requirements, such as production weld coupons, clearly specified.

    • Pass
    • Flag
    • Fail

    Pressure testing requirements, if any, clearly specified

    • Pass
    • Flag
    • Fail

    Competency of welding organization to perform welding activities in accordance with codes, standards, and specifications specified

    • Pass
    • Flag
    • Fail

    Roles and responsibilities of engineers, welding organization, and welding inspectors defined and appropriate for the work.

    • Pass
    • Flag
    • Fail

    Independence of the inspection organization from the production organization is clear and demonstrated.

    • Pass
    • Flag
    • Fail

    WPS(s) are properly qualified and meet applicable codes, standards and specifications for the work.

    • Pass
    • Flag
    • Fail

    Procedure qualification records (PQR) are properly performed and support the WPS(s).

    • Pass
    • Flag
    • Fail

    Welder performance qualifications (WPQ) meet requirements for the WPS.

    • Pass
    • Flag
    • Fail

    NDE examiners are properly certified for the NDE technique.

    • Pass
    • Flag
    • Fail

    NDE procedures are current and accurate.

    • Pass
    • Flag
    • Fail

    Calibration of NDE equipment is current.

    • Pass
    • Flag
    • Fail

    Welding machine calibration is current

    • Pass
    • Flag
    • Fail

    Instruments such as ammeters, voltmeters, contact pyrometers, have current calibrations.

    • Pass
    • Flag
    • Fail

    Storage ovens for welding consumables operate with automatic heat control and visible temperature indication.

    • Pass
    • Flag
    • Fail

    Heat treatment procedure is available and appropriate

    • Pass
    • Flag
    • Fail

    Pressure testing procedures are available and detail test requirements.

    • Pass
    • Flag
    • Fail

    PWHT equipment calibration is current.

    • Pass
    • Flag
    • Fail

    Pressure testing equipment and gauges calibrated and meet appropriate test requirements.

    • Pass
    • Flag
    • Fail

    Material test certifications are available and items properly marked (including back-up ring if used ;).

    • Pass
    • Flag
    • Fail

    Electrode marking, bare wire flag tags, identification on spools of wire, etc. as-specified.

    • Pass
    • Flag
    • Fail

    Filler material markings are traceable to a filler material certification.

    • Pass
    • Flag
    • Fail

    Base metal markings are traceable to a material certification.

    • Pass
    • Flag
    • Fail

    Recording of filler and base metal traceability information is performed.

    • Pass
    • Flag
    • Fail

    Base metal stampings are low stress and not detrimental to the component.

    • Pass
    • Flag
    • Fail

    Paint striping color code is correct for the material of construction.

    • Pass
    • Flag
    • Fail

    PMI records supplement the material traceability and confirm the material of construction.

    • Pass
    • Flag
    • Fail

    Weld preparation surfaces are free of contaminants and base metal defects such as laminations and cracks.

    • Pass
    • Flag
    • Fail

    Preheat, if required, applied for thermal cutting c. Hydrogen bake-out heat treatment, if required, performed to procedure.

    • Pass
    • Flag
    • Fail

    Weld joint is free from oxide and sulfide scales, hydrocarbon residue, and any excessive build-up of weld-through primers.

    • Pass
    • Flag
    • Fail

    Weld joint type, bevel angle, root face and root opening are correct.

    • Pass
    • Flag
    • Fail

    Alignment and mismatch is correct and acceptable.

    • Pass
    • Flag
    • Fail

    Dimensions of base materials, filler metal, and weld joint are correct.

    • Pass
    • Flag
    • Fail

    Piping socket welds have proper gap.

    • Pass
    • Flag
    • Fail

    Preheat equipment and technique are acceptable.

    • Pass
    • Flag
    • Fail

    Preheat coverage and temperature are correct.

    • Pass
    • Flag
    • Fail

    Reheat, if required, applied to thermal cutting operations.

    • Pass
    • Flag
    • Fail

    Preheat, if required, applied to remove moisture

    • Pass
    • Flag
    • Fail

    Filler metal type and size are correct per procedure.

    • Pass
    • Flag
    • Fail

    Filler metals are being properly handled and stored.

    • Pass
    • Flag
    • Fail

    Filler metals are clean and free of contaminants.

    • Pass
    • Flag
    • Fail

    Coating on coated electrodes is neither damaged nor wet.

    • Pass
    • Flag
    • Fail

    Flux is appropriate for the welding process and being properly handled.

    • Pass
    • Flag
    • Fail

    Inert gases, if required are appropriate for shielding and purging.

    • Pass
    • Flag
    • Fail

    Gas composition is correct and meets any purity requirements.

    • Pass
    • Flag
    • Fail

    Shielding gas and purging manifold systems are periodically bled to prevent back filling with air.

    • Pass
    • Flag
    • Fail

    Stage 2 - Welding Inspection During Welding

    Welder is responsible for quality craftsmanship of weldments

    • Pass
    • Flag
    • Fail

    Welder meets qualification requirements

    • Pass
    • Flag
    • Fail

    Welder understands welding procedure and requirements for the work.

    • Pass
    • Flag
    • Fail

    Special training and mock-up weldments performed if required.

    • Pass
    • Flag
    • Fail

    Welder understands the inspection hold-points.

    • Pass
    • Flag
    • Fail

    Essential variables are being met during welding.

    • Pass
    • Flag
    • Fail

    Filler material, fluxes, and inert gas composition/flow rate.

    • Pass
    • Flag
    • Fail

    Purge technique, flow rate, O2 analysis, etc.

    • Pass
    • Flag
    • Fail

    Rod warmers energized or where rod warmers are not employed, the welder complies with maximum exposure times out of the electrode oven.

    • Pass
    • Flag
    • Fail

    Preheating during tack welding and tack welds removed (if required).

    • Pass
    • Flag
    • Fail

    Welding technique, weld progression, bead overlap, etc.

    • Pass
    • Flag
    • Fail

    Equipment settings such as amps, volts, and wire feed.

    • Pass
    • Flag
    • Fail

    Preheat and interpass temperatures.

    • Pass
    • Flag
    • Fail

    Travel speed (key element in heat input).

    • Pass
    • Flag
    • Fail

    Heat input (where appropriate).

    • Pass
    • Flag
    • Fail

    Mock-up weldment, if required, meets requirements with welder and welding engineer.

    • Pass
    • Flag
    • Fail

    Welder displays confidence and adheres to good welding practices.

    • Pass
    • Flag
    • Fail

    Tack welds to be incorporated in the weld are of acceptable quality.

    • Pass
    • Flag
    • Fail

    Weld root has adequate penetration and quality.

    • Pass
    • Flag
    • Fail

    Cleaning between weld passes and of any back-gouged surfaces is acceptable.

    • Pass
    • Flag
    • Fail

    Additional NDE performed between weld passes and on back-gouged surfaces shows acceptable results.

    • Pass
    • Flag
    • Fail

    In-process rework and defect removal is accomplished.

    • Pass
    • Flag
    • Fail

    In-process ferrite measurement, if required, is performed and recorded.

    • Pass
    • Flag
    • Fail

    Final weld reinforcement and fillet weld size meets work specifications and drawings.

    • Pass
    • Flag
    • Fail

    Stage 3 - Welding Inspection Upon Completion Of Welding

    Size, length and location of all welds conform to the drawings / specifications / Code.

    • Pass
    • Flag
    • Fail

    No welds added without approval.

    • Pass
    • Flag
    • Fail

    Dimensional and visual checks of the weld don’t identify welding discontinuities, excessive distortion and poor workmanship.

    • Pass
    • Flag
    • Fail

    Temporary attachments and attachment welds removed and blended with base metal.

    • Pass
    • Flag
    • Fail

    Discontinuities reviewed against acceptance criteria for defect classification.

    • Pass
    • Flag
    • Fail

    PMI of the weld, if required and examiner’s findings indicate they comply with the specification.

    • Pass
    • Flag
    • Fail

    Welder stamping/marking of welds confirmed.

    • Pass
    • Flag
    • Fail

    Perform field hardness check.

    • Pass
    • Flag
    • Fail

    Verify NDE is performed at selected locations and review examiner’s findings.

    • Pass
    • Flag
    • Fail

    Specified locations examined.

    • Pass
    • Flag
    • Fail

    Specified frequency of examination.

    • Pass
    • Flag
    • Fail

    NDE performed after final PWHT.

    • Pass
    • Flag
    • Fail

    Work of each welder included in random examination techniques.

    • Pass
    • Flag
    • Fail

    RT film quality, IQI placement, IQI visibility, etc. complies with standards.

    • Pass
    • Flag
    • Fail

    Inspector is in agreement with examiners interpretations and findings.

    • Pass
    • Flag
    • Fail

    Documentation for all NDE correctly executed

    • Pass
    • Flag
    • Fail

    Verify post-weld heat treatment is performed to the procedure and produces acceptable results.

    • Pass
    • Flag
    • Fail

    Paint marking and other detrimental contamination removed.

    • Pass
    • Flag
    • Fail

    Temporary attachments removed.

    • Pass
    • Flag
    • Fail

    Machined surfaces protected from oxidation.

    • Pass
    • Flag
    • Fail

    Equipment internals, such as valve internals, removed to prevent damage.

    • Pass
    • Flag
    • Fail

    Equipment supported to prevent distortion.

    • Pass
    • Flag
    • Fail

    Thermocouples fastened properly.

    • Pass
    • Flag
    • Fail

    Thermocouples adequately monitor the different temperature zones and thickest/thinnest parts in the fabrication.

    • Pass
    • Flag
    • Fail

    Temperature monitoring system calibrated.

    • Pass
    • Flag
    • Fail

    Local heating bandwidth is adequate.

    • Pass
    • Flag
    • Fail

    Insulation applied to the component where required for local heating.

    • Pass
    • Flag
    • Fail

    Temperature and hold time is correct.

    • Pass
    • Flag
    • Fail

    Heating rate and cooling rate is correct.

    • Pass
    • Flag
    • Fail

    Distortion is acceptable after completion of the thermal cycle.

    • Pass
    • Flag
    • Fail

    Hardness indicates an acceptable heat treatment

    • Pass
    • Flag
    • Fail

    Verify pressure test is performed to the procedure

    • Pass
    • Flag
    • Fail

    Pressure meets test specification.

    • Pass
    • Flag
    • Fail

    Test duration is as-specified.

    • Pass
    • Flag
    • Fail

    Metal temperature of component meets minimum and maximum requirements.

    • Pass
    • Flag
    • Fail

    Pressure drop or decay is acceptable per procedure.

    • Pass
    • Flag
    • Fail

    Visual examination does not reveal defects.

    • Pass
    • Flag
    • Fail

    Perform a final audit of the inspection dossier to identify inaccuracies and incomplete information.

    • Pass
    • Flag
    • Fail

    All verifications in the quality plan were properly executed.

    • Pass
    • Flag
    • Fail

    Inspection reports are complete, accepted and signed by responsible parties.

    • Pass
    • Flag
    • Fail

    Inspection reports, NDE examiners interpretations and findings are accurate.

    • Pass
    • Flag
    • Fail

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.