Omnizone™ Constant Volume Water-Cooled Cooling Unit 50BVJ: Inspection Maintenance
This procedure is for the general and inspection maintenance of your Water-Cooled Cooling Unit. It focuses on cleaning the unit exterior and its alignment.
Omnizone™ Constant Volume Water-Cooled Cooling Unit 50BVJ: Inspection Maintenance
This procedure is for the general and inspection maintenance of your Water-Cooled Cooling Unit. It focuses on cleaning the unit exterior and its alignment.
Inspection
Check coil baffles for tight fit to prevent air from bypassing the coil.
Check panels for air leakage, particularly those sealing the fan and coil compartments.
Check for loose electrical connections, compressor oil levels, proper refrigerant charge, and refrigerant piping leaks.
Before start-up, be sure all optional service valves are open.
Source: MaintainX (Community Member)