Copy - SS0186 Issue 02 Autoclave Pre-Operational Night shift Checks – Normanton
Night shift pre-operational checks to be completed prior to machine start - up. See SOP092 in resource library.
Copy - SS0186 Issue 02 Autoclave Pre-Operational Night shift Checks – Normanton
Night shift pre-operational checks to be completed prior to machine start - up. See SOP092 in resource library.
Checks to be completed
Check air inlet above 6 Bar
Clean the excess waster and waste on the pit floor
Add or drag pictures
Clean and inspect door seal removing any waste
Check Drains are clear
Remove any waste from autoclave around locking ring
Grease door wedges with high temp grease
Check door swing and alignment with locking ring
Inspect gauges and pipework for leaks or damage
Review and submission
Any additional parts or service required
Add or drag pictures
Any comments?
Completed by
Please sign to confirm checks have been completed in full and any concerns have been raised
Click here to sign
Click here to sign