Back

Copy - SS0186 Issue 02 Autoclave Pre-Operational Night shift Checks – Normanton

Night shift pre-operational checks to be completed prior to machine start - up. See SOP092 in resource library.
United Kingdom
08/22/2023

Copy - SS0186 Issue 02 Autoclave Pre-Operational Night shift Checks – Normanton

Night shift pre-operational checks to be completed prior to machine start - up. See SOP092 in resource library.

    Checks to be completed

    Check air inlet above 6 Bar

    • Pass
    • Flag
    • Fail

    Clean the excess waster and waste on the pit floor

    Add or drag pictures

    Clean and inspect door seal removing any waste

    • Pass
    • Flag
    • Fail

    Check Drains are clear

    • Pass
    • Flag
    • Fail

    Remove any waste from autoclave around locking ring

    • Pass
    • Flag
    • Fail

    Grease door wedges with high temp grease

    • Pass
    • Flag
    • Fail

    Check door swing and alignment with locking ring

    • Pass
    • Flag
    • Fail

    Inspect gauges and pipework for leaks or damage

    • Pass
    • Flag
    • Fail

    Review and submission

    Any additional parts or service required

    Add or drag pictures

    Any comments?

    Completed by

    Please sign to confirm checks have been completed in full and any concerns have been raised

    Click here to sign

    Click here to sign
Source: United Kingdom (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.