Weekend Inspections Day Shift
Use the guidelines below for the inspection of your oxidizer control panel.
Weekend Inspections Day Shift
Use the guidelines below for the inspection of your oxidizer control panel.
Date & Time
Planned work & Breakdowns
11 KV , 30 V Battery Checks
Carry out the following Inspections on the assets listed:
No.4 Substation - check mains light is on, mains power, battery visual check and press/hold test button for approx. 5 seconds and note down voltage.
B6 Substation - check mains light is on, mains power, battery visual check and press/hold test button for approx. 5 seconds and note down voltage.
B10 Substation – check mains light is on, mains power and check digital read out and note down.
Fire Pump Batteries 1 & 2
Carry out the following Inspections on the assets listed:
Pump 1 Battery 1 Voltage and Charge level
Pump 1 Battery 2 Voltage and Charge level
Pump 1 Battery 3 Voltage and Charge level
Pump 1 Battery 4 Voltage and Charge level
Pump 2 Battery 1 Voltage and Charge level
Pump 2 Battery 2 Voltage and Charge level
Pump 2 Battery 3 Voltage and Charge level
Pump 2 Battery 4 Voltage and Charge level
Capacitor Load Check readings
Carry out the following Inspections on the assets listed:
Old Mill 1
Old Mill 3
Old Mill 4
15A 1
25A 1
26A 1
21 EB
25 Cap Bank
25 Cap Bank
CS2 Earthing and bonding check, Visual.
Carry out the following Inspections on the assets listed:
Flange 1
Flange 2
Flange 3
Flange 4
Flange 5
Flange 6
Flange 7
Flange 8
Flange 8
General
Fire Detection Panel Status
Carry out the following Inspections on the assets listed:
B3 Fire panel – check status of panel, main power on and any faults/alarms.
B10 Fire panel – check status of panel, main power on and any faults/alarms.
B8 Fire panel – check status of panel, main power on and any faults/alarms.
Chlorine units
Carry out the following Inspections on the assets listed
Krofta - Press the MENU key, then press the down ARROW key until the MAINT menu appears. Press ENTER. Remove the plug from the top hole of the colorimeter. 3 Colorimeter assembly. Gently insert a straightened paper clip into the hole at the top of the colorimeter and slowly pull out the stir bar. Insert a wooden or paper cotton-tipped swab* into the opening and move it up and down with a gentle scrubbing action, cleaning the interior surfaces of the colorimeter cell. Clean the stir bar with the cotton swab.
Effluent Outfall - Press the MENU key, then press the down ARROW key until the MAINT menu appears. Press ENTER. Remove the plug from the top hole of the colorimeter. 3 Colorimeter assembly. Gently insert a straightened paper clip into the hole at the top of the colorimeter and slowly pull out the stir bar. Insert a wooden or paper cotton-tipped swab* into the opening and move it up and down with a gentle scrubbing action, cleaning the interior surfaces of the colorimeter cell. Clean the stir bar with the c
Winder VSD’s filters
Carry out the following Inspections on the assets listed:
19 winder – clean drive panel filter or replace if damaged and beyond cleaning.
20 winder – clean drive panel filter or replace if damaged and beyond cleaning.
21 winder – clean drive panel filter or replace if damaged and beyond cleaning.
22 winder – clean drive panel filter or replace if damaged and beyond cleaning.
30 winder – clean drive panel filter or replace if damaged and beyond cleaning.
Site VSD Panel Fillters
1 Weekend Each Month
AS Per Folder Clean - Replace
Corrective Action
Were any Checks Incomplete
if the answer is "oneOf [Yes ]"
If Not Why Not
Is Any Follow up Work Required
if the answer is "oneOf [Yes]"
Remarks
Are all guards and their fixing in place, secure and operational? (If NO, state reason)
if the answer is "oneOf [No]"
Remarks
Any other Comments