Back

BUNN iMIX® Hot Beverage System Biannual Inspection

The BUNN iMIX® Hot Beverage System Biannual Inspection Form offers a straight-forward list of parts that need inspecting.
MaintainX
04/26/2021

BUNN iMIX® Hot Beverage System Biannual Inspection

The BUNN iMIX® Hot Beverage System Biannual Inspection Form offers a straight-forward list of parts that need inspecting.

    Check and/or replace every 6 months or as required.

    Mixing Chamber Kit (Includes all items below)

    • Pass
    • Flag
    • Fail

    Steam Collector OK

    • Pass
    • Flag
    • Fail

    Mixing Chamber OK

    • Pass
    • Flag
    • Fail

    Whipper Chamber OK

    • Pass
    • Flag
    • Fail

    Dispense Tip OK

    • Pass
    • Flag
    • Fail

    O-ring OK

    • Pass
    • Flag
    • Fail

    Frother OK

    • Pass
    • Flag
    • Fail

    Shaft Seal OK

    • Pass
    • Flag
    • Fail

    Receptacle OK

    • Pass
    • Flag
    • Fail

    Elbow OK

    • Pass
    • Flag
    • Fail
Source: Bunn

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.