CHECKLIST STARTING GENSET (GEDUNG B)

This checklist is for starting the genset in Building B. It includes verifying the fuel system by checking the main fuel tank level and gate valve positions, as well as inspecting the float valve function and daily fuel tank levels.
MAINTENANCE ( KMI )
07/13/2024

CHECKLIST STARTING GENSET (GEDUNG B)

This checklist is for starting the genset in Building B. It includes verifying the fuel system by checking the main fuel tank level and gate valve positions, as well as inspecting the float valve function and daily fuel tank levels.

    SALURAN BAHAN BAKAR

    LEVEL SOLAR TANKI UTAMA (STANDARD 80%)

    CEK POSISI GATE VALVE 1

    CEK FUNGSI FLOAT VALVE

    CEK LEVEL SOLAR TANKI DAILY (STANDARD 100%)

    CEK POSISI GATE VALVE 2

    CEK SEPARATOR

    ACCU

    CEK KEKENCANGAN BAUT POLE ACCU

    CEK LEVEL AIR ACCU

    ENGINE (PRIME MOVER)

    CEK LEVEL OLI

    CEK WARNA OLI

    CEK KANDUNGAN GRAM OLI

    CONTROL PANEL

    ENGINE SPEED ( Rpm ) ( STANDARD 1500 Rpm )

    OIL PRESSURE ( kPa ) ( STANDARD 450 kPa

    WATER RADIATOR TEMP. (°C ) ( STANDARD 85°C )

    RUNNING HOURS

    FREQUENCY ( Hz ) ( STANDARD 50Hz)

    VOLTAGE L1 – L2 / L1 – N ( V ) (STANDARD 380V / 220 V)

    VOLTAGE L2 – L3 / L2 – N ( V ) (STANDARD 380V / 220 V)

    VOLTAGE L3 – L1 / L3 – N ( V ) (STANDARD 380V / 220 V)

    RUNNING DURATION ( HH : MM )

Source: MAINTENANCE ( KMI ) (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.