CHECKLIST STARTING GENSET (GEDUNG B)
This checklist is for starting the genset in Building B. It includes verifying the fuel system by checking the main fuel tank level and gate valve positions, as well as inspecting the float valve function and daily fuel tank levels.
CHECKLIST STARTING GENSET (GEDUNG B)
This checklist is for starting the genset in Building B. It includes verifying the fuel system by checking the main fuel tank level and gate valve positions, as well as inspecting the float valve function and daily fuel tank levels.
SALURAN BAHAN BAKAR
LEVEL SOLAR TANKI UTAMA (STANDARD 80%)
CEK POSISI GATE VALVE 1
CEK FUNGSI FLOAT VALVE
CEK LEVEL SOLAR TANKI DAILY (STANDARD 100%)
CEK POSISI GATE VALVE 2
CEK SEPARATOR
ACCU
CEK KEKENCANGAN BAUT POLE ACCU
CEK LEVEL AIR ACCU
ENGINE (PRIME MOVER)
CEK LEVEL OLI
CEK WARNA OLI
CEK KANDUNGAN GRAM OLI
CONTROL PANEL
ENGINE SPEED ( Rpm ) ( STANDARD 1500 Rpm )
OIL PRESSURE ( kPa ) ( STANDARD 450 kPa
WATER RADIATOR TEMP. (°C ) ( STANDARD 85°C )
RUNNING HOURS
FREQUENCY ( Hz ) ( STANDARD 50Hz)
VOLTAGE L1 – L2 / L1 – N ( V ) (STANDARD 380V / 220 V)
VOLTAGE L2 – L3 / L2 – N ( V ) (STANDARD 380V / 220 V)
VOLTAGE L3 – L1 / L3 – N ( V ) (STANDARD 380V / 220 V)
RUNNING DURATION ( HH : MM )
Source: MAINTENANCE ( KMI ) (Community Member)