Back

Caterpillar PM2 500-Hour Maintenance

This procedure outlines the tasks required for the Caterpillar PM2 maintenance at a 500-hour interval. The goal is to ensure optimal performance and longevity of the Caterpillar machinery.
Engineering Aggregates Corp
06/11/2024

Caterpillar PM2 500-Hour Maintenance

This procedure outlines the tasks required for the Caterpillar PM2 maintenance at a 500-hour interval. The goal is to ensure optimal performance and longevity of the Caterpillar machinery.

    Inspect drive axle oil

    • Pass
    • Flag
    • Fail

    Inspect frame of dump body

    • Pass
    • Flag
    • Fail

    Inspect oil both front wheel oil

    • Pass
    • Flag
    • Fail
Source: Engineering Aggregates Corp (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.