Shake & Sundae Carpigiani Preventative Maintenance
The Shake & Sundae Carpigiani Preventative Maintenance Inspection Form gives you a complete list for your daily, weekly and fortnightly cleaning operations. Some of the parts that you will check are the dispensing door, tank mixer and cylinder beater to name a few.
Shake & Sundae Carpigiani Preventative Maintenance
The Shake & Sundae Carpigiani Preventative Maintenance Inspection Form gives you a complete list for your daily, weekly and fortnightly cleaning operations. Some of the parts that you will check are the dispensing door, tank mixer and cylinder beater to name a few.
During daily, weekly and fortnightly cleaning operations, check carefully the integrity of parts subject to wear: if they appear worn, torn or not totally functional replace them.
The manufacturer offers programmed maintenance plans that include the periodical replacement of parts subject to wear.
SHAKE SIDE
PUMP
Integrity of O-ring and overflow valves
Dry smoothness of gears in their seats.
DISPENSING DOOR
Check O-ring integrity, check smoothness of piston.
Check syrup duck bill valves
TANK MIXER
Check if it rotates freely.
CYLINDER BEATER
Check if beater idler and scraper blade show dents and check their integrity.
Check integrity of beater seal (# 28).
Check that the wear on the bushing on the beater idler is no more than 2 mm, as indicated by the marking on the bushing itself. If there is more than 2 mm wear, it is necessary to replace the beater idler
PERISTALTIC PUMP TUBE (# 385)
Check the integrity
PUMP
Integrity of O-ring and overflow valves.
Dry smoothness of gears in their seats.
DISPENSING LID
Check integrity of O-ring, check smoothness of piston
CYLINDER BEATER
Check if scraper blades show dents and crack.
Check if end-pusher and beater idler show dents and check their integrity.
Check integrity of beater seal (# 28).
PERIODICAL CHECK-UP AND MAINTENANCE
PERISTALTIC PUMP TUBE REPLACEMENT INSTRUCTION
PUMP TUBE REMOVAL
Pump Tube Installation
Source: Carpigiani (www.manualslib.com)