26W - Filler 3 Sanitary Inspection

The purpose of the procedure is to make sure the equipment is at standard regarding CIP and cleaning processes. Please make sure the machine is down, and use LOTO for your SAFETY. In order to perform this inspection, open all the lower side panels.
Lactalis Casa Grande
06/04/2024

26W - Filler 3 Sanitary Inspection

The purpose of the procedure is to make sure the equipment is at standard regarding CIP and cleaning processes. Please make sure the machine is down, and use LOTO for your SAFETY. In order to perform this inspection, open all the lower side panels.

    Section #1 - Peroxide Feed System

    Inspect the Peroxide reservoir - please remove the side panel to access the tank. Check for leaks.

    • camera.jpg
    • Pass
    • Flag
    • Fail

    Check feed lines to secondary pump for leaks and damage. Inspect the pump condition too.

    • camera.jpg
    • camera2.jpg
    • Pass
    • Flag
    • Fail

    Inspect the heater block for damage

    • camera.jpg
    • camera2.jpg
    • Pass
    • Flag
    • Fail

    Check flexible hoses that feed nozzle assembly for cracks or damage

    • camera.jpg
    • camera2.jpg
    • Pass
    • Flag
    • Fail

    Inspect Peroxide nozzles for visible defects. There are 5 set of 3 nozzles. each set

    • camera.jpg
    • camera2.jpg
    • Pass
    • Flag
    • Fail

    Section #2 - Spray nozzles and balls Inspection

    Check the condition of the spray balls - replace any missing or damaged ones PN: SB125X025NPT316360 for 1/4" and SB125X050NPT316360 for 1/2"

    There are 6 above the chain level, and 5 under chain level

    • camera.jpg
    • camera2.jpg
    • camera3.jpg
    • camera4.jpg
    • camera5.jpg
    • camera2.jpg
    • camera3.jpg
    • camera.jpg
    • camera2.jpg
    • camera3.jpg
    • camera.jpg
    • camera2.jpg
    • camera.jpg
    • camera2.jpg

    Section #3 - FIlters Replacement

    • camera.jpg

    Section #4 - Product Tank Inspection

    • camera.jpg
    • camera2.jpg

    Section #5 - Product valves inspection

    Valve 2Y26 Inspection

    • Pass
    • Flag
    • Fail

    Valve 2Y13 Inspection

    • Pass
    • Flag
    • Fail

    Section #6 - Door Gaskets Inspection

    Section #7 - Test Filler

    Section #8 - Procedure completion

    Technician Signature after inspection was completed

    Click here to sign
Source: Lactalis Casa Grande (Community Member)

Please note that any procedure, checklist, or other document available in the MaintainX Procedure Hub is provided for general education and information only and does not constitute legal, medical, or financial advice. MaintainX makes the materials available AS IS and AS PROVIDED, without warranties of any kind. By downloading or using any such materials, you assume the risk that they may not be appropriate for your specific situation and agree that you are solely responsible for any such use, including compliance with applicable law and with meeting any conditions of product warranties.